The “Shadyyan Gurlushyk” Economic Society is participating in the International Conference and Exhibition "Development of the Construction, Industrial, Chemical, and Energy Industries of Turkmenistan" (CIET 2025), which opened in the “Avaza” National Tourist Zone. At its stand, the company is showcasing a portfolio of completed projects using modern, innovative technologies.
“Shadyyan Gurlushyk”, which has been operating since 2019, presented information to exhibition participants on major projects built in various regions of Turkmenistan. Among the company's completed projects are a 350-bed multidisciplinary hospital in Arkadag (2023), a branch of the “Turkmenistan” State Bank in Arkadag (2023), seven-story residential buildings with 28 apartments in Arkadag (2023), a multidisciplinary hospital in Magtymguly etrap (2021), the reconstruction of a multidisciplinary hospital in Balkanabat (2023), and other medical and social facilities.

The company is currently renovating several medical facilities in the Balkan region, including the maternity ward of the Maternal and Child Health Center, a blood bank, a forensic medical examination building, and a pathology service.

The Ministry of Health and Medical Industry has awarded contracts to “Shadyyan Gurlushyk” for the construction of a 300-bed multidisciplinary hospital in Tejen, Ahal velayat, and a 400-bed Maternal and Child Health Center in Dashoguz. Construction began in October 2025, and the facilities will be equipped with modern medical equipment and commissioned in October 2028.
